Menu
0
0
0
0
0

GEO5

Контекстная справка

Tree
Settings
Программа:
Язык

FHWA GEC 010

The calculation of the vertical bearing capacity of the pile is performed in accordance with FHWA Standard GEC 010 - Drilled Shafts: Construction Procedures and Design Methods (September 2018), where all procedures are described in detail.

The calculation results in a pile base bearing capacity Rb and a pile shaft bearing capacity Rs.

Скачайте бесплатную демо-версию GEO5.